Green Square Stormwater Drainage Project

Project Profile:

In a partnership with the City of Sydney, the DG Alliance Green Square Stormwater Drainage Project involves the construction of a 2.4km underground stormwater drain that connect from Link Road, Zetland to the existing stormwater canal in Alexandria to reduce flooding in the previous floodplain.

Client: DG Alliance (UGL Engineering, Seymour Whyte)

Status: Current

O’Halloran Management Services Engagement:

During the project, O’Halloran Management Services has worked under the safety policies and protocols of both the DG Alliance, UGL Engineering, Seymour Whyte and Sydney Water.

O’Halloran management services provided:

  • 4ton – 25ton Excavators
  • Skid Steer Plant
  • Non-Destructive Excavation
  • Specialised Trucks including;
    • Flat Bed
    • Tipper Trucks (including Side Tip)
    • Crane Trucks
    • Bogies
  • 12ton Multi-Tip Dumpers
  • Balloon Tyre Dumpers